NAMAKHVANI HYDRO POWER PLANT CASCADE PROJECT
  • Press Releases | Terms of Use | Privacy Policy
NAMAKHVANI HYDRO POWER PLANT CASCADE PROJECT
  • About Us
    • About Namakhvani HPP
    • About ENKA
    • Licenses and Permits
    • Studies
  • News
  • Sustainability
    • Namakhvani Social Projects
    • ENKA Sustainability
      • Sustainability Policy
      • Code of Business Conduct
      • Hеalth & Safety Management Approach & Policy
      • Environmental Management Approach & Policy
  • Engineering & Quality
    • Namakhvani Project Engineering
    • ENKA Design & Engineering
      • Architectural Design Group
      • Civil & Structural Engineering Group
      • Energy Engineering Group
    • ENKA Quality Management
  • Career
  • Contact
    • Contact Us
    • Grievance

Home|

Studies

Studies and reports on the project of the two-stage hydropower cascade project on the Rioni River in Tskaltubo Municipality (Tvishi HPP with 100 MW installed capacity and Namakhvani-Zhoneti HPP with 333 MW installed capacity).

Geology Appendices

Reports

Environmental Impact Assessment Report

Report No:3

Supplement Report No:3

Seismicity

Environmental Flow_Assessment EFlow

Hydraulic Calculations

Hydraulic calculations of bottom water runoff

Hydrology

On thermal waters

Appendix 9

Drawings

Drawing 01

Drawing 02

Drawing 03

Drawing 04

Drawing 05

Drawing 06

Drawing 06.1

Drawing 06.2

Drawing 07

Drawing 08

Drawing 09

Drawing 10

Drawing 11

Drawing 12

Drawing 13

Drawing 14

Drawing 15

Drawing 15.1

Drawing 15.2

Drawing 15.3

Drawing 15.4

Drawing 15.5

Drawing 15.6

Drawing 15.7

Drawing 15.8

Drawing 15.9

Drawing 15.10

Drawing 16

Drawing 16.1

Drawing 16.2

Drawing 16.3

Drawing 16.4

Drawing 17

Drawing 18

Drawing 19

Drawing 20

Drawing 21

Nam_Fig. 1

Nam_Fig. 2

Nam_Fig. 3

Nam_Fig. 4

Nam_Geo_50-01

Rioni Cross-section-02

Topo_K_38_50_A-B-V-G

Privacy Policy | Terms of Use | Career © 2020 ENKA All rights reserved.